Photos of the construction process.
  • Construction began by gluing the hull panels to full length.
    Construction began by gluing the hull panels to full length.
  • The hull is wired up using temporary frames.
    The hull is wired up using temporary frames.
  • All wired up.
    All wired up.
  • The seams are glued with epoxy and the wire stitches are pulled out.
    The seams are glued with epoxy and the wire stitches are pulled out.
  • The hull is then sanded smooth in preparation for fiberglassing.
    The hull is then sanded smooth in preparation for fiberglassing.
  • The hull is fiberglassed.
    The hull is fiberglassed.
  • The boat is flipped and work on the interior begins.
    The boat is flipped and work on the interior begins.
  • Half of the interior has been fiberglassed.
    Half of the interior has been fiberglassed.
  • The first part of the rails is epoxied in place.
    The first part of the rails is epoxied in place.
  • The rails are installed.
    The rails are installed.
  • The hull is sanded in preparation for painting.
    The hull is sanded in preparation for painting.
  • The interior is varnished.
    The interior is varnished.
  • View of one of the custom bulkheads.
    View of one of the custom bulkheads.
  • The hull is painted.
    The hull is painted.