Photos of the construction process. - From starting deck to finishing.
  •  3/17/16 - The first two deck strips are in place.

    3/17/16 - The first two deck strips are in place.

  •  3/18/16 - Strip detail on the stern.

    3/18/16 - Strip detail on the stern.

  •  3/28/16 - The aft deck is partially stripped.

    3/28/16 - The aft deck is partially stripped.

  •  3/29/16 - The forward deck is stripped.

    3/29/16 - The forward deck is stripped.

  •  3/31/16 - Stripping of the main part of the deck is complete.

    3/31/16 - Stripping of the main part of the deck is complete.

  •  4/1/16 - The cockpit recess area is cut out.

    4/1/16 - The cockpit recess area is cut out.

  •  The cockpit recess is filled in with strips.

    The cockpit recess is filled in with strips.

  •  4/2/16 - The deck is sanded in preparation for fiberglassing.

    4/2/16 - The deck is sanded in preparation for fiberglassing.

  •  4/4/16 - Fiberglass cloth is laid on the deck.

    4/4/16 - Fiberglass cloth is laid on the deck.

  •  The cloth is saturated with epoxy.

    The cloth is saturated with epoxy.

  •  View from the stern.

    View from the stern.

  •  4/5/16 - The deck and forms have been removed from the hull.

    4/5/16 - The deck and forms have been removed from the hull.

  •  The inside of the hull is cleaned up.

    The inside of the hull is cleaned up.

  •  4/6/16 - Fiberglass cloth is laid in the hull.

    4/6/16 - Fiberglass cloth is laid in the hull.

  •  The cloth is saturated with epoxy.

    The cloth is saturated with epoxy.

  •  4/7/16 - Fiberglass cloth is laid on the underside of the deck.

    4/7/16 - Fiberglass cloth is laid on the underside of the deck.

  •  Saturated with epoxy.

    Saturated with epoxy.

  •  4/8/16 - The nameplate is ready for the aft bulkhead.

    4/8/16 - The nameplate is ready for the aft bulkhead.

  •  The outline for the forward hatch is traced on the deck.

    The outline for the forward hatch is traced on the deck.

  •  Aft hatch.

    Aft hatch.

  •  The aft hatch is cut out.

    The aft hatch is cut out.

  •  The coaming riser is made from strips.

    The coaming riser is made from strips.

  •  4/9/16 - The aft hatch lip is made from several layers of laminated fiberglass.

    4/9/16 - The aft hatch lip is made from several layers of laminated fiberglass.

  •  Underside of the coaming wall is filletted with epoxy.

    Underside of the coaming wall is filletted with epoxy.

  •  4/11/16 - The inside of the coaming wall is fiberglassed.

    4/11/16 - The inside of the coaming wall is fiberglassed.

  •  Outside of the coaming wall is fiberglassed.

    Outside of the coaming wall is fiberglassed.

  •  4/12/16 - The strapless hatch system is epoxied into place on the hatch covers.

    4/12/16 - The strapless hatch system is epoxied into place on the hatch covers.

  •  Paua shell is inlayed and fiberglassed.

    Paua shell is inlayed and fiberglassed.

  •  4/13/16 - The deck and hull are epoxied together.

    4/13/16 - The deck and hull are epoxied together.

  •  The cockpit coaming lip is created from several layers of fiberglass.

    The cockpit coaming lip is created from several layers of fiberglass.

  •  4/19/16 - The boat is given a washdown after being sanded.

    4/19/16 - The boat is given a washdown after being sanded.

  •  4/20/16 - The hull is ready for varnish.

    4/20/16 - The hull is ready for varnish.

  •  4/21/16 - First coat of varnish has been applied.

    4/21/16 - First coat of varnish has been applied.

  •  4/24/16 - Clear coating the hull is done.

    4/24/16 - Clear coating the hull is done.

  •  4/25/16 - The deck is ready for varnish.

    4/25/16 - The deck is ready for varnish.

  •  First coat is applied.

    First coat is applied.

  •  5/1/16 - The super comfortable Redfish seat is wedged into place.

    5/1/16 - The super comfortable Redfish seat is wedged into place.