This boat was built with soft padeyes, hatches and bulkheads, perimeter lines, and an upgraded finish.

Length:  20 feet
Beam:  30 inches
Weight: 60 lbs.
Photos of the completed project.

Click on photos for slideshow
  •  12/8/17 - The boat is finished.

    12/8/17 - The boat is finished.

  •  Pygmy Osprey Double

    Pygmy Osprey Double

  •  Pygmy Osprey Double

    Pygmy Osprey Double

  •  9/25/17 - The first 4 panels of the hull are loosely wired together.

    9/25/17 - The first 4 panels of the hull are loosely wired together.

  •  The seams are filled with thickened epoxy.

    The seams are filled with thickened epoxy.

  •  9/29/17 - Half of the hull is sanded smooth.

    9/29/17 - Half of the hull is sanded smooth.

  •  Fiberglass cloth is smoothed on the hull.

    Fiberglass cloth is smoothed on the hull.

  •  10/2/17 - The hull is flipped over and temporary frames for the deck are attached.

    10/2/17 - The hull is flipped over and temporary frames for the deck are attached.

  •  All hull panels are wired together.

    All hull panels are wired together.

  •  10/17/17 - The interior is fiberglassed.

    10/17/17 - The interior is fiberglassed.

  •  10/18/17 - The bow and stern tips are filled with thickened epoxy.

    10/18/17 - The bow and stern tips are filled with thickened epoxy.

  •  The deck has been sanded smooth in preparation for fiberglassing.

    The deck has been sanded smooth in preparation for fiberglassing.

  •  11/2/17 - The forward cockpit coaming riser is epoxied in place.

    11/2/17 - The forward cockpit coaming riser is epoxied in place.

  •  11/2/17 - The coaming lips are fiberglassed.

    11/2/17 - The coaming lips are fiberglassed.

  •  11/14/17 - Toggles for the strapless hatch system are laminated together.

    11/14/17 - Toggles for the strapless hatch system are laminated together.

  •  11/29/17 - The first coat of varnish is on the hull.

    11/29/17 - The first coat of varnish is on the hull.

  •  12/5/17 - Soft Padeyes are installed.

    12/5/17 - Soft Padeyes are installed.