Photos of the construction process.
  •  12/3/20 - The boat is in the workshop.

    12/3/20 - The boat is in the workshop.

  •  12/4/20 - The hull is sanded and ready for fiberglass.

    12/4/20 - The hull is sanded and ready for fiberglass.

  •  12/6/20 - Fiberglass cloth is laid on the hull.

    12/6/20 - Fiberglass cloth is laid on the hull.

  •  The glass is saturated with epoxy.

    The glass is saturated with epoxy.

  •  12/8/20 - The hull is given two fill coats of epoxy.

    12/8/20 - The hull is given two fill coats of epoxy.

  •  11/9/20 - The deck is wired together.

    11/9/20 - The deck is wired together.

  •  12/12/20 - Fiberglass is laid on the underside of the deck.

    12/12/20 - Fiberglass is laid on the underside of the deck.

  •  The entire underside of the deck is given a coat of epoxy.

    The entire underside of the deck is given a coat of epoxy.

  •  12/15/20 - The inside of the hull is ready for fiberglass.

    12/15/20 - The inside of the hull is ready for fiberglass.

  •  Interior has been saturated with epoxy.

    Interior has been saturated with epoxy.

  •  12/16/20 - Footbrace studs are installed.

    12/16/20 - Footbrace studs are installed.

  •  The deck is epoxied in place.

    The deck is epoxied in place.

  •  12/17/20 - The inside of the shear joint is filled with epoxy and fiberglassed.

    12/17/20 - The inside of the shear joint is filled with epoxy and fiberglassed.

  •  Other sheer joint is epoxied.

    Other sheer joint is epoxied.

  •  12/18/20 - The deck is sanded half way.

    12/18/20 - The deck is sanded half way.

  •  Fiberglass is laid on the deck.

    Fiberglass is laid on the deck.

  •  12/19/20 - The fiberglass is saturated with epoxy.

    12/19/20 - The fiberglass is saturated with epoxy.

  •  12/21/20 - Strapless hatches parts are fabricated.

    12/21/20 - Strapless hatches parts are fabricated.

  •  Bulkheads are fiberglassed.

    Bulkheads are fiberglassed.

  •  Two epoxy fill coats have been applied to the deck.

    Two epoxy fill coats have been applied to the deck.

  •  12/23/20 - Hatch shapes are traced on the deck.

    12/23/20 - Hatch shapes are traced on the deck.

  •  Aft hatch is cut out.

    Aft hatch is cut out.

  •  Forward hatch is cut out.

    Forward hatch is cut out.

  •  Aft bulkhead is epoxied in place.

    Aft bulkhead is epoxied in place.

  •  Forward bulkhead is epoxied in place.

    Forward bulkhead is epoxied in place.

  •  12/24/20 - The coaming riser is epoxied in place.

    12/24/20 - The coaming riser is epoxied in place.

  •  12/28/20 - The kayak is stood on end for epoxy endpours.

    12/28/20 - The kayak is stood on end for epoxy endpours.

  •  12/30/20 - The coaming lip is fiberglassed.

    12/30/20 - The coaming lip is fiberglassed.

  •  12/31/20 - The aft hatch lip is epoxied in place.

    12/31/20 - The aft hatch lip is epoxied in place.

  •  Coaming gets a fill coat of epoxy.

    Coaming gets a fill coat of epoxy.

  •  Forward hatch lip is epoxied in place.

    Forward hatch lip is epoxied in place.

  •  1/3/21 - The deck and half the hull is finish sanded.

    1/3/21 - The deck and half the hull is finish sanded.

  •  1/6/21 - The strapless hatch system is epoixed to the hatch lids.

    1/6/21 - The strapless hatch system is epoixed to the hatch lids.

  •  The entire hull has been sanded.

    The entire hull has been sanded.

  •  1/7/21 - The first coat of varnish is applied to the hull.

    1/7/21 - The first coat of varnish is applied to the hull.

  •  1/10/21 - The deck is ready for varnish.

    1/10/21 - The deck is ready for varnish.

  •  1/11/21 - Several coats of varnish have been applied.

    1/11/21 - Several coats of varnish have been applied.

  •  1/13/21 - Several coats of varnish have been applied.

    1/13/21 - Several coats of varnish have been applied.

  •  Strapless hatch system is setup.

    Strapless hatch system is setup.

  •  Upgraded seat is installed.

    Upgraded seat is installed.