Photos of the construction process.
  •  4/25/23 - The first few panels and bulkheads are wired in place.

    4/25/23 - The first few panels and bulkheads are wired in place.

  •  Transom is wired into place.

    Transom is wired into place.

  •  The boat is wired up.

    The boat is wired up.

  •  The boat is flipped upright and breasthook and knees are epoxied in place.

    The boat is flipped upright and breasthook and knees are epoxied in place.

  •  View from above.

    View from above.

  •  4/26/23 - The chines are epoxied.

    4/26/23 - The chines are epoxied.

  •  5/15/23 - The cockpit walls are fitted.

    5/15/23 - The cockpit walls are fitted.

  •  Walls are epoxied in place.

    Walls are epoxied in place.

  •  5/16/23 - The cockpit walls are filletted.

    5/16/23 - The cockpit walls are filletted.

  •  The insides of the cockpit tanks are sealed with epoxy.

    The insides of the cockpit tanks are sealed with epoxy.

  •  5/31/23 - The side seats are filled with flotation foam.

    5/31/23 - The side seats are filled with flotation foam.

  •  6/12/23 - The seat top halves are epoxied together.

    6/12/23 - The seat top halves are epoxied together.

  •  6/16/23 - The seat top is test fit.

    6/16/23 - The seat top is test fit.

  •  The seat is epoxied in place (after epoxy sealing the underside.)

    The seat is epoxied in place (after epoxy sealing the underside.)

  •  The joint between seat and hull is filleted.

    The joint between seat and hull is filleted.

  •  6/20/23 - Reinforcement pieces are epoxied to the tops of the bulkheads.

    6/20/23 - Reinforcement pieces are epoxied to the tops of the bulkheads.

  •  6/21/23 - The tops of the bulkheads are filleted and knees are added.

    6/21/23 - The tops of the bulkheads are filleted and knees are added.

  •  6/23/23 - The centerboard trunk is test fit.

    6/23/23 - The centerboard trunk is test fit.

  •  6/26/23 - The centerboard and rudder are fiberglassed on one side.

    6/26/23 - The centerboard and rudder are fiberglassed on one side.

  •  Inwale spacers are epoxied in place.

    Inwale spacers are epoxied in place.

  •  6/27/23 - Centerboard truck is epoxied in place.

    6/27/23 - Centerboard truck is epoxied in place.

  •  6/29/23 - Half of the hull is sanded.

    6/29/23 - Half of the hull is sanded.

  •  Hull is sanded and ready for fiberglass.

    Hull is sanded and ready for fiberglass.

  •  Fiberglass cloth is laid on the hull.

    Fiberglass cloth is laid on the hull.

  •  Centerboard and rudder are given fill coats. CB has graphite powder in the epoxy.

    Centerboard and rudder are given fill coats. CB has graphite powder in the epoxy.

  •  Fiberglass is saturated with epoxy.

    Fiberglass is saturated with epoxy.

  •  Skeg is epoxied on.

    Skeg is epoxied on.

  •  7/5/23 - The skeg is reinforced with a fillet and fiberglass.

    7/5/23 - The skeg is reinforced with a fillet and fiberglass.

  •  Bow is reinforced with a strip of fiberglass.

    Bow is reinforced with a strip of fiberglass.

  •  7/6/23 - The hole for the centerboard is cut.

    7/6/23 - The hole for the centerboard is cut.

  •  7/10/23 - The hull is seal coated with epoxy.

    7/10/23 - The hull is seal coated with epoxy.

  •  7/11/23 -  Several coats of epoxy have been applied.

    7/11/23 - Several coats of epoxy have been applied.

  •  7/17/23 - The hull is half sanded.

    7/17/23 - The hull is half sanded.

  •  7/19/23 - The first part of installing the rails is done.

    7/19/23 - The first part of installing the rails is done.

  •  9/4/23 - The port side inwale is epoxied in place.

    9/4/23 - The port side inwale is epoxied in place.

  •  9/12/23 - The interior is sealed with epoxy.

    9/12/23 - The interior is sealed with epoxy.

  •  9/15/23 - The mast step is installed.

    9/15/23 - The mast step is installed.