Photos of the construction process.
  •  8/12/21 - The boat as it was at the end of class.

    8/12/21 - The boat as it was at the end of class.

  •  The inside sheer joint is filled with epoxy and reinforced with fiberglass tape.

    The inside sheer joint is filled with epoxy and reinforced with fiberglass tape.

  •  8/17/21 - The hull is given two fill coats of epoxy.

    8/17/21 - The hull is given two fill coats of epoxy.

  •  10/1/21 - Footbrace studs are installed.

    10/1/21 - Footbrace studs are installed.

  •  10/4/21 - The coaming is ready for fiberglass.

    10/4/21 - The coaming is ready for fiberglass.

  •  The glass is saturated with epoxy.

    The glass is saturated with epoxy.

  •  10/11/21 - The deck is given the first fill coat of epoxy.

    10/11/21 - The deck is given the first fill coat of epoxy.

  •  10/15/21 - The hull is half sanded.

    10/15/21 - The hull is half sanded.

  •  10/20/21 - Several coats of varnish have been applied to the hull.

    10/20/21 - Several coats of varnish have been applied to the hull.

  •  10/21/21 - The deck is given first coat of varnish.

    10/21/21 - The deck is given first coat of varnish.

  •  10/23/21 - Several more coats of varnish have been applied.

    10/23/21 - Several more coats of varnish have been applied.