3/14/20 - The original state of the boat.
3/24/20 - The bulkheads are ready for fiberglass.
Recessed deck fittings are fabricated.
One side of footbrace studs are installed.
4/2/20 - The hull is half sanded.
Before and after sections.
Hatch lips and recessed fittings are sealed with epoxy.
4/4/20 - A thick bead of epoxy is applied to the bow.
4/6/20 - Fiberglass cloth is laid on the hull.
The cloth is saturated with epoxy.
8/8/20 - Two fill coats of epoxy are applied to the hull.
4/9/20 - Time to work on the deck.
4/10/20 - The deck is sanded.
4/13/20 - Fiberglass cloth is laid on the deck.
The fiberglass is saturated with epoxy.
4/14/20 - The glass is trimmed.
4/15/20 - Two fill coats of epoxy have been applied.
4/16/20 - Hatch shapes are drawn on the deck.
The hatches are cut out.
Recessed deck fittings are epoxed in place.
4/20/20 - The recessed fittings are sanded and taped off for fiberglassing.
The fiberglass is saturated.
Coaming riser is epoxied in place.
4/21/20 - The coaming lip is epoxied in place.
4/22/20 - The aft bulkhead is installed.
The forward bulkhead is installed.
4/23/20 - Fiberglass cloth is laid on the coaming lip.
The glass is saturated with epoxy.
The forward hatch lip is epoxied in place.
4/24/20 - The fiberglass is trimmed and an epoxy fill coat is added.
The aft hatch lip is epoxied in place.
4/29/20 - The boat is sanded and ready for varnish.
4/30/20 - The hull is washed and ready for varnish.
Once coat of varnish is applied.
5/2/20 - Several coats of varnish have been applied.
5/4/20 - The deck is ready for varnish.
First varnish coat on the hatch covers.
5/5/20 - First coat of varnish on the deck.
5/7/20 - Several coats of varnish have been applied.
5/8/20 - Deck rigging and hatch straps are installed.