4/9/20 - The build begins by unpacking the kit.
-
4/10/20 - The hull panels are laid out.
-
4/16/20 - Fiberglass is laid on the hull panels.
-
4/17/20 - The cloth is saturated with epoxy.
-
4/20/20 - The last two hull panels and two bulkheads are ready for fiberglass.
-
The fiberglass is saturated with epoxy.
-
4/22/20 - The hull panels are sanded.
-
4/23/20 - Several parts are given a seal coat of epoxy.
-
The rails are epoxied together.
-
4/26/20 - The bottom panel and #1 panels are wired into place.
-
4/27/20 - The #2 panels are wired into place.
-
The #3 panels are in place.
-
The rails are epoxied in place.
-
4/28/20 - The seams are filled with thickened epoxy.
-
4/29/20 - The inner stem is epoxied in place.
-
Wires are pulled from the hull.
-
Transom reinforcement is epoxied in place.
-
4/30/20 - A second reinforcement piece is epoxied in place.
-
5/7/20 - The bow bulkhead and mast step are given an epoxy fillet.
-
The transom and aft seat bulkhead are fileted with epoxy.
-
5/7/20 - The temporary section of the aft seat bulkhead is cut out.
-
5/11/20 - The underside of the rails are given an epoxy fillet.
-
Take-apart bulkheads are reinforced.
-
Take-apart bulkheads are fiberglassed.
-
5/13/20 - The bow is shaped.
-
Half of the seams are filleted with thickened epoxy.
-
5/14/20 - The other half of the boat is filleted.
-
The take-apart bulkheads are sanded.
-
Spacer strips are stuck on the bulkheads.
-
5/15/20 - The take-apart bulkhead is epoxied in place.
-
5/18/20 - Gussests are epoxied in place.
-
Rudder trunk parts are fiberglassed.
-
5/19/20 - The daggerboard trunk is assembled.
-
The take-apart bulkhead is filleted.
-
5/20/20 - The daggerboard trunk is assembled.
-
5/21/20 - The daggerboard trunk is sealed with epoxy and the rudder trunk is assembled.
-
Fiberglass tape is cut from a roll.
-
Glass tape and peel ply are ready to reinforce the seams between panels.
-
5/22/20 - The daggerboard trunk is epoxied in place.
-
The fiberglass tape is saturated with epoxy and covered with peel ply.
-
5/23/20 - The take-apart gussests are sanded smooth.
-
5/24/20 - Gussets are fiberglassed.
-
The aft seat pieces are fiberglassed.
-
5/26/20 - The aft seat tops are taped in place in order to put in a blind fillet.
-
The daggerboard slot is cut out.
-
Sheer clamps are epoxied to the deck halves.
-
5/27/20 - The mast partner is epoxied in place.
-
The aft seat walls are epoxied in place.
-
The deck halves are epoxied together.
-
5/28/20 - The aft seat tops are epoxied in place.
-
5/29/20 - The aft seats are given an epoxy fillet.
-
6/1/20 - The underside of the deck is sealed with epoxy.
-
Take-apart bolts are epoxied in place.
-
The edges of the seats are fiberglassed.
-
The edges of the foils are created with thickened epoxy.
-
The hatch cover reinforcement is epoxied in place.
-
6/2/20 - The hatch lip is epoxied in place.
-
The foils are fiberglassed.
-
6/3/20 - The boat is sawed in half.
-
The boat halves are separated.
-
Take apart bolt sockets are filled with epoxy.
-
The deck is fiberglassed.
-
6/5/20 - The deck is given a fill coat of epoxy.
-
6/11/20 - Edges are given an epoxy reinforcement.
-
Close up.
-
6/12/20 - The mast tube is epoxied in place.
-
6/14/20 - The deck is epoxied in place.
-
6/15/20 - The deck to hull joint is filleted with epoxy.
-
6/18/20 - The aft section is sanded smooth.
-
Forward section is sanded.
-
Rudder is temporarily mounted on the transom.
-
6 oz. fiberglass is laid on the hulls.
-
The glass is saturated with epoxy.
-
Various pieces are given epoxy fill coats.
-
6/19/20 - 8 oz. fiberglass is laid on the hull.
-
6/22/20 - The aft section is glassed.
-
Forward section.
-
6/23/20 - Several fill coats of epoxy are applied to the forward section.
-
Several fill coats of epoxy are applied to the aft section.
-
6/24/20 - The transom is fiberglassed.
-
Forward take apart bulkhead is fiberglassed.
-
6/25//20 - The skeg is epoxied in place.
-
6/27/20 - The skeg is fiberglassed.
-
6/28/20 - The top edges of the rails are ready for fiberglass.
-
The glass is saturated with epoxy.
-
7/1/20 - The sides of the rails are covered with fiberglass.
-
Forward section.
-
Bits and pieces are sealed with epoxy.
-
7/6/20 - Half of the aft section is sanded.
-
Protective fiberglass strips are epoxied into the top of the daggerboard trunk.
-
7/7/20 - The aft section is sanded.
-
The forward section is sanded.
-
8/10/20 - The first coat of primer is applied.
-
Bow section.
-
8/11/20 - The primer is sanded.
-
8/11/20 - The first coat of paint is on the hull.
-
8/18/20 - Several coats of paint later.
-
8/19/20 - The alignment clips are mounted.
-
8/30/20 - Sanding dust is washed from the interior.
-
8/31/20 - First coat of varnish is applied.
-
Parts and pieces are varnished.
-
9/2/20 - Several coats of varnish have been applied.
-
9/4/20 - Footbrace locations are marked.
-
Footbraces are epoxied in place.
-
Oarlock risers are epoxied in place.
-
9/6/20 - The rudder is mounted.
-
The rubber bumper strip is glued in place.