5/10/20 - The project begins.
5/11/20 - The starboard side sheer seam is filled with epoxy and fiberglass tape.
5/12/20 - The port side sheer seam is filled with epoxy and fiberglass tape.
Gaps between panels are filled with epoxy.
5/14/20 - The Hull is half sanded.
Sanded and ready for fiberglass.
Fiberglass cloth is laid on the hull.
5/14/20 - The glass is saturated with epoxy.
5/15/20 - A fill coat of epoxy is applied.
5/18/20 - Gaps between the deck panels are filled with epoxy.
Bulkheads are fiberglassed.
5/19/20 - The deck is sanded smooth.
Fiberglass cloth is laid on the deck.
5/20/20 - The fiberglass is saturated with epoxy.
5/21/20 - A fill coat of epoxy is added.
Cockpit coaming lips are fiberglassed.
5/23/20 - The hatch shapes are traced on tape.
The hatches are cut out.
Footbrace studs are installed.
5/25/20 - Bulkheads are epoxied in place.
5/27/20 - The coaming riser is epoxied into place.
5/28/20 - The hull is sanded.
5/29/20 - The coaming lip is epoxied in place.
5/30/20 - The coaming is ready for fiberglass.
The glass is saturated with epoxy.
Hatch lips are epoxied in place.
5/31/20 - The coaming is given epoxy fill coats.
6/3/20 - The first coat of varnish is applied to the hull.
6/5/20 - Several coats of varnish have been applied.
5/7/20 - The deck has two coats of varnish.
6/9/20 - The deck rigging and seat are installed.