12/3/20 - The boat is in the workshop.
-
12/4/20 - The hull is sanded and ready for fiberglass.
-
12/6/20 - Fiberglass cloth is laid on the hull.
-
The glass is saturated with epoxy.
-
12/8/20 - The hull is given two fill coats of epoxy.
-
11/9/20 - The deck is wired together.
-
12/12/20 - Fiberglass is laid on the underside of the deck.
-
The entire underside of the deck is given a coat of epoxy.
-
12/15/20 - The inside of the hull is ready for fiberglass.
-
Interior has been saturated with epoxy.
-
12/16/20 - Footbrace studs are installed.
-
The deck is epoxied in place.
-
12/17/20 - The inside of the shear joint is filled with epoxy and fiberglassed.
-
Other sheer joint is epoxied.
-
12/18/20 - The deck is sanded half way.
-
Fiberglass is laid on the deck.
-
12/19/20 - The fiberglass is saturated with epoxy.
-
12/21/20 - Strapless hatches parts are fabricated.
-
Bulkheads are fiberglassed.
-
Two epoxy fill coats have been applied to the deck.
-
12/23/20 - Hatch shapes are traced on the deck.
-
Aft hatch is cut out.
-
Forward hatch is cut out.
-
Aft bulkhead is epoxied in place.
-
Forward bulkhead is epoxied in place.
-
12/24/20 - The coaming riser is epoxied in place.
-
12/28/20 - The kayak is stood on end for epoxy endpours.
-
12/30/20 - The coaming lip is fiberglassed.
-
12/31/20 - The aft hatch lip is epoxied in place.
-
Coaming gets a fill coat of epoxy.
-
Forward hatch lip is epoxied in place.
-
1/3/21 - The deck and half the hull is finish sanded.
-
1/6/21 - The strapless hatch system is epoixed to the hatch lids.
-
The entire hull has been sanded.
-
1/7/21 - The first coat of varnish is applied to the hull.
-
1/10/21 - The deck is ready for varnish.
-
1/11/21 - Several coats of varnish have been applied.
-
1/13/21 - Several coats of varnish have been applied.
-
Strapless hatch system is setup.
-
Upgraded seat is installed.