12/3/20 - The boat is in the workshop.
12/4/20 - The hull is sanded and ready for fiberglass.
12/6/20 - Fiberglass cloth is laid on the hull.
The glass is saturated with epoxy.
12/8/20 - The hull is given two fill coats of epoxy.
11/9/20 - The deck is wired together.
12/12/20 - Fiberglass is laid on the underside of the deck.
The entire underside of the deck is given a coat of epoxy.
12/15/20 - The inside of the hull is ready for fiberglass.
Interior has been saturated with epoxy.
12/16/20 - Footbrace studs are installed.
The deck is epoxied in place.
12/17/20 - The inside of the shear joint is filled with epoxy and fiberglassed.
Other sheer joint is epoxied.
12/18/20 - The deck is sanded half way.
Fiberglass is laid on the deck.
12/19/20 - The fiberglass is saturated with epoxy.
12/21/20 - Strapless hatches parts are fabricated.
Bulkheads are fiberglassed.
Two epoxy fill coats have been applied to the deck.
12/23/20 - Hatch shapes are traced on the deck.
Aft hatch is cut out.
Forward hatch is cut out.
Aft bulkhead is epoxied in place.
Forward bulkhead is epoxied in place.
12/24/20 - The coaming riser is epoxied in place.
12/28/20 - The kayak is stood on end for epoxy endpours.
12/30/20 - The coaming lip is fiberglassed.
12/31/20 - The aft hatch lip is epoxied in place.
Coaming gets a fill coat of epoxy.
Forward hatch lip is epoxied in place.
1/3/21 - The deck and half the hull is finish sanded.
1/6/21 - The strapless hatch system is epoixed to the hatch lids.
The entire hull has been sanded.
1/7/21 - The first coat of varnish is applied to the hull.
1/10/21 - The deck is ready for varnish.
1/11/21 - Several coats of varnish have been applied.
1/13/21 - Several coats of varnish have been applied.
Strapless hatch system is setup.
Upgraded seat is installed.