Photos of the construction process.
  •  10/10/22 - The hull panels are laid out.

    10/10/22 - The hull panels are laid out.

  •  10/13/22 - Fiberglass is laid on hull panels.

    10/13/22 - Fiberglass is laid on hull panels.

  •  The glass is saturated with epoxy.

    The glass is saturated with epoxy.

  •  10/17/22 - The #3 panels and various parts are fiberglassed.

    10/17/22 - The #3 panels and various parts are fiberglassed.

  •  10/19/22 - The bottom panel and #1 panels are wired in place.

    10/19/22 - The bottom panel and #1 panels are wired in place.

  •  10/20/22 - #2 panels are wired in place.

    10/20/22 - #2 panels are wired in place.

  •  #3 panels are in place.

    #3 panels are in place.

  •  Rails are epoxied in place.

    Rails are epoxied in place.

  •  10/21/22 - The boat is flipped and the seams between panels are filled.

    10/21/22 - The boat is flipped and the seams between panels are filled.

  •  10/24/22 - The transom inwale is epoxied in place.

    10/24/22 - The transom inwale is epoxied in place.

  •  The inner stem is epoxied in place.

    The inner stem is epoxied in place.

  •  10/25/22 - The aft seat bulkhead is filleted.

    10/25/22 - The aft seat bulkhead is filleted.

  •  Mast partners are epoxied onto the forward bulkhead.

    Mast partners are epoxied onto the forward bulkhead.

  •  Reinforcement plates are epoxied onto the take-apart bulkhead.

    Reinforcement plates are epoxied onto the take-apart bulkhead.

  •  10/26/22 - Take - apart bulkheads are fiberglassed.

    10/26/22 - Take - apart bulkheads are fiberglassed.

  •  10/31/22 - The seams between panels are filleted and covered with fiberglass tape.

    10/31/22 - The seams between panels are filleted and covered with fiberglass tape.

  •  The take apart bulkheads are prepared to be installed.

    The take apart bulkheads are prepared to be installed.

  •  11/1/22 - The forward seat cleats are epoxied in place.

    11/1/22 - The forward seat cleats are epoxied in place.

  •  Take apart bulkheads are epoxied in place.

    Take apart bulkheads are epoxied in place.

  •  Bow is shaped and towing fitting is epoxied in.

    Bow is shaped and towing fitting is epoxied in.

  •  11/2/22 - Underside of the deck is fiberglass taped.

    11/2/22 - Underside of the deck is fiberglass taped.

  •  Knees are epoxied in place.

    Knees are epoxied in place.

  •  11/3/22 - Underside of the deck is reinforced.

    11/3/22 - Underside of the deck is reinforced.

  •  Daggerboard trunk is epoxied in place.

    Daggerboard trunk is epoxied in place.

  •  Aft seat tank walls are epoxied in place.

    Aft seat tank walls are epoxied in place.

  •  11/4/22 - Aft seat tank tops are epoxied in place.

    11/4/22 - Aft seat tank tops are epoxied in place.

  •  11/7/22 - The aft seat is sanded.

    11/7/22 - The aft seat is sanded.

  •  The seat edges are fiberglassed.

    The seat edges are fiberglassed.

  •  The bulkhead knees are glassed.

    The bulkhead knees are glassed.

  •  11/13/22 - The underside of the deck is epoxy sealed.

    11/13/22 - The underside of the deck is epoxy sealed.

  •  11/14/2 - Time to cut a perfectly good boat in half!

    11/14/2 - Time to cut a perfectly good boat in half!

  •  The boat is two boats now!

    The boat is two boats now!

  •  The aft edges of the foils are epoxy reinforced.

    The aft edges of the foils are epoxy reinforced.

  •  11/15/22 - The deck is epoxied in place.

    11/15/22 - The deck is epoxied in place.

  •  11/16/22 - The forward deck is filletted.

    11/16/22 - The forward deck is filletted.

  •  11/25/22 - Deck is given an epoxy fill coat.

    11/25/22 - Deck is given an epoxy fill coat.

  •  Foils are fiberglassed.

    Foils are fiberglassed.

  •  11/26/22 - Breasthook is epoxied in.

    11/26/22 - Breasthook is epoxied in.

  •  11/18/22 - The top edge of the gunwale is ready for fiberglass.

    11/18/22 - The top edge of the gunwale is ready for fiberglass.

  •  Aft section gunwale is glassed.

    Aft section gunwale is glassed.

  •  11/30/22 - The hulls are sanded smooth.

    11/30/22 - The hulls are sanded smooth.

  •  Rudder gudgeons and pintles are test mounted.

    Rudder gudgeons and pintles are test mounted.

  •  12/1/22 - Fiberglass is laid on the hulls.

    12/1/22 - Fiberglass is laid on the hulls.

  •  The glass is saturatred with epoxy.

    The glass is saturatred with epoxy.

  •  12/2/2 - The bottom is ready for fiberglass.

    12/2/2 - The bottom is ready for fiberglass.

  •  12/4/22 - The skeg is epoxied and fiberglassed in place.

    12/4/22 - The skeg is epoxied and fiberglassed in place.

  •  12/5/22 - The hull is coated with epoxy thickened with fairing compound.

    12/5/22 - The hull is coated with epoxy thickened with fairing compound.

  •  12/6/22 - Fiberglass rub strips are fitted in the daggerboard slot.

    12/6/22 - Fiberglass rub strips are fitted in the daggerboard slot.

  •  The rail is fiberglassed.

    The rail is fiberglassed.

  •  Forward section.

    Forward section.

  •  Underside of the daggerboard slot.

    Underside of the daggerboard slot.

  •  1/3/23 - Half the the hull is sanded.

    1/3/23 - Half the the hull is sanded.

  •  1/9/23 - The alignment clips are temporarily mounted.

    1/9/23 - The alignment clips are temporarily mounted.

  •  1/12/23 - A spacer for an outboard is epoxied in place.

    1/12/23 - A spacer for an outboard is epoxied in place.

  •  1/17/23 - The interior is sanded and ready for varnish.

    1/17/23 - The interior is sanded and ready for varnish.

  •  1/19/23 - Sanding dust is washed off.

    1/19/23 - Sanding dust is washed off.

  •  The interior is varnished.

    The interior is varnished.

  •  Extra parts are varnished.

    Extra parts are varnished.

  •  1/24/23 - First coat of Interlux Perfection Off-white is applied.

    1/24/23 - First coat of Interlux Perfection Off-white is applied.

  •  Foils are painted on one side.

    Foils are painted on one side.

  •  1/27/23 - Locations for footbraces are taped off.

    1/27/23 - Locations for footbraces are taped off.

  •  2/1/23 - Gaskets for the hatch and daggerboard slot plug are installed.

    2/1/23 - Gaskets for the hatch and daggerboard slot plug are installed.

  •  2/6/23 - The outboard is fit one last time and the boat is finished!

    2/6/23 - The outboard is fit one last time and the boat is finished!