Photos of the construction process.
  •  5/11/23 - The boat is badly stained.

    5/11/23 - The boat is badly stained.

  •  5/11/23 - The deck is partially sanded.

    5/11/23 - The deck is partially sanded.

  •  The hull before sanding.

    The hull before sanding.

  •  The hull is partially sanded.

    The hull is partially sanded.

  •  5/12/23 - The hull is sanded.

    5/12/23 - The hull is sanded.

  •  Fiberglass is laid on the hull.

    Fiberglass is laid on the hull.

  •  The glass is saturated with epoxy.

    The glass is saturated with epoxy.

  •  5/14/23 - Epoxy fill coats are added.

    5/14/23 - Epoxy fill coats are added.

  •  5/16/23 - Fiberglass is laid on the deck.

    5/16/23 - Fiberglass is laid on the deck.

  •  5/17/23 - The glass is eposy saturated.

    5/17/23 - The glass is eposy saturated.

  •  Excess fiberglass is trimmed off.

    Excess fiberglass is trimmed off.

  •  5/31/23 - Coaming and hatch parts are fiberglassed.

    5/31/23 - Coaming and hatch parts are fiberglassed.

  •  6/1/23 - Hatches are cut out from the deck.

    6/1/23 - Hatches are cut out from the deck.

  •  6/2/23 - The bulkheads are fiberglassed.

    6/2/23 - The bulkheads are fiberglassed.

  •  Coaming riser is epoxied in place.

    Coaming riser is epoxied in place.

  •  Hatch lips are epoxied together.

    Hatch lips are epoxied together.

  •  The hole for tying a carrying loop is sanded.

    The hole for tying a carrying loop is sanded.

  •  6/5/23 - Footbraces studs are installed.

    6/5/23 - Footbraces studs are installed.

  •  6/6/23 - The aft bulkhead is filletted.

    6/6/23 - The aft bulkhead is filletted.

  •  Forward bulkhead is filletted and the second set of footbrace studs is installed.

    Forward bulkhead is filletted and the second set of footbrace studs is installed.

  •  6/9/23 - The cockpit coaming lip and aft hatch lip are epoxied in place.

    6/9/23 - The cockpit coaming lip and aft hatch lip are epoxied in place.

  •  Front hatch lip is epoxied in place.

    Front hatch lip is epoxied in place.

  •  6/12/23 - The coaming is fiberglassed.

    6/12/23 - The coaming is fiberglassed.

  •  6/21/23 - The hull is sanded in preparation for varnish.

    6/21/23 - The hull is sanded in preparation for varnish.

  •  6/22/23 - First coat of varnish is applied to the hull.

    6/22/23 - First coat of varnish is applied to the hull.

  •  6/25/23 - Third coat of varnish.

    6/25/23 - Third coat of varnish.

  •  6/26/23 - Final coat of varnish.

    6/26/23 - Final coat of varnish.

  •  6/27/23 - The deck is ready for varnish.

    6/27/23 - The deck is ready for varnish.

  •  First coat of varnish is on.

    First coat of varnish is on.

  •  7/7/23 - Deck hardware is installed.

    7/7/23 - Deck hardware is installed.