9/19/23 - The boat is in the workshop.
The state of the hull.
9/20/23 - The hull is sanded and ready for fiberglass.
The fiberglass is saturated with epoxy.
9/21/23 - The fiberglass is given a fill coat of epoxy.
9/25/23 - The deck is half sanded.
Hole for carrying handle is created.
The entire deck is sanded and filled.
9/26/23 - Bulkheads and hatch lips are fiberglased on one side.
10/2/23 - The deck is ready for epoxy.
The fiberglass is epoxy saturated.
Cockpit coaming lips and hatch lips are fiberglassed.
Flip sides of bulkheads are glassed.
10/4/23 - Hatches are marked out.
Hatches are cut out of the deck.
The inside of the port side deck to hull joint is filletted and fiberglassed.
Hatch lips are epoxied together.
10/5/23 - Starboard site joint is epoxied.
10/8/23 - End pours are applied.
10/9/23 - Forward bulkhead is epoxied in place.
Aft bulkhead is epoxied in place.
Aft hatch lips are epoxied in place.
Forward hatch lips are epoxied in place.
10/10/23 - The cockpit coaming riser is epoxied in place.
The coaming lip is epoxied in place.
10/11/23 - The coaming is ready for fiberglass.
10/12/23 - The glass is saturated with epoxy.
10/13/23 - The coaming is given a fill coat of epoxy.
10/16/23 - Blocks for Rudder cables are epoxied in place.
10/21/23 - Hatch hold down dowls are epoxied in place.
10/24/23 - Half of the hull is sanded in preparation for varnish.
10/28/23 - First coat of varnish.
10/28/23 - Another varnish coat.
10/30/23 - The deck is ready for varnish.
First coat of varnish.
11/02/23 - The upgraded seat is installed.
Soft padeyes are installed.
Deck rigging and perimeter lines are installed.
Rudder is installed.