Photos of the construction process.
  •  11/26/22 - I sewed a mainsail cover.

    11/26/22 - I sewed a mainsail cover.

  •  Testing out an old genoa off a MacGregor 25.

    Testing out an old genoa off a MacGregor 25.

  •  Genoa is working well.

    Genoa is working well.

  •  6/30/23 - A new motor had to be installed. It came with a better screen which I installed in a better place.

    6/30/23 - A new motor had to be installed. It came with a better screen which I installed in a better place.

  •  8/26/23 - Bottom paint was renewed and I added a bootstripe.

    8/26/23 - Bottom paint was renewed and I added a bootstripe.

  •  The boat sits nicely on the newly lowered bunks.

    The boat sits nicely on the newly lowered bunks.

  •  10/31/23 - The new double flap system is installed.

    10/31/23 - The new double flap system is installed.

  •  12/14/23 - The tiller is reinforced.

    12/14/23 - The tiller is reinforced.

  •  12/2/23 - New turning block is added to make it easier to lift keel.

    12/2/23 - New turning block is added to make it easier to lift keel.

  •  12/22/23 - Yellow line for the second reef is installed.

    12/22/23 - Yellow line for the second reef is installed.

  •  New companionway main hatch is fiberglassed.

    New companionway main hatch is fiberglassed.

  •  2/28/24 - The top of the new hatch is epoxy filled.

    2/28/24 - The top of the new hatch is epoxy filled.

  •  Underside of the hatch is painted.

    Underside of the hatch is painted.

  •  3/10/24 - New 5 KWh LiFePo4 batteries are installed for the electric motor.

    3/10/24 - New 5 KWh LiFePo4 batteries are installed for the electric motor.

  •  3/20/24 - The new hatch is installed.

    3/20/24 - The new hatch is installed.

  •  Hatch in the closed position.

    Hatch in the closed position.

  •  6/24/24 - New bottom paint and a new motor retracting system.

    6/24/24 - New bottom paint and a new motor retracting system.