11/13/23 - The boat is ready to be finished.
-
11/15/23 - The spars are epoxied to full length.
-
11/25/23 - The mast partner is temporarily mounted.
-
The gudgeons and pintles are temporarily mounted.
-
11/27/23 - The spars have been shaped and holes drilled for rigging.
-
Hanger bolts for the removable thwart are installed.
-
Nameplate is installed. Also holes for gudgeons have been drilled and filled.
-
11/29/23 - The spars are epoxy sealed.
-
11/30/23 - Foam flotation blocks are epoxied to the seats.
-
12/4/23 - The under seat foam is taped off.
-
Foam is painted matte black.
-
12/5/23 - The interior is washed.
-
First coat of varnish is applied.
-
12/8/23 - First coat of varnish on the thwarts.
-
Second coat of varnish on the interior.
-
12/12/23 - The hull is sanded.
-
First coat of varnish is applied.
-
Aft seats and rudder are varnished.
-
12/13/23 - The wood is looking shiny!
-
12/15/23 - Thwarts are installed.
-
12/17/23 - The mast fits nicely.