3/8/19 - The boat is finished!
Pygmy Pinguino 145
1/22/19 - The panels will be joined with a stip of fiberglass tape.
No. 1 and 2. panels are wired together with the temporary frames.
Wires are all tightened.
The boat is flipped and ready for the seams to be epoxied.
1/25/19 - The seams are filled with thickened epoxy.
1/26/19 - The wires are pulled and gaps are filled with epoxy.
Fiberglass cloth is laid on the hull.
The cloth is saturated with epoxy.
The center deck panels are epoxied together.
The deck seams are filled with thickened epoxy.
The interior is fiberglassed.
Fiberglass cloth is laid on the deck.
2/13/19 - The hatches are traced out on the deck.
Forward hatch is cut out.
The coaming lip is epoxied in place.
2/17/19 - The coaming is giving a fill coat of epoxy.
The hull is sanded.
2/26/19 - Sanding dust is washed off the hull.
2/28/19 - Several coats of varnish have been applied.
The first coat of varnish is applied to the deck.
3/3/19 - Several coats of varnish are applied to the deck.
3/8/19 - The upgraded seat is installed.