1/22/19 - The panels will be joined with a stip of fiberglass tape.
1/23/19 - Fiberglass tape is applied to the other side of the panels.
1/24/19 - The bottom panels are wired together.
No. 1 and 2. panels are wired together with the temporary frames.
All of the panels are wired together.
Wires are all tightened.
The boat is flipped and ready for the seams to be epoxied.
1/25/19 - The seams are filled with thickened epoxy.
1/26/19 - The wires are pulled and gaps are filled with epoxy.
1/28/19 - Half of the hull is sanded smooth.
The hull is sanded smooth.
Fiberglass cloth is laid on the hull.
The cloth is saturated with epoxy.
1/29/19 - Two fill coats of epoxy are applied.
The center deck panels are epoxied together.
1/31/19 - The deck panels are partially wired.
The deck seams are filled with thickened epoxy.
2/1/19 - The deck is flipped over and prepped for fiberglass tape.
2/2/19 - The underside of the deck is sealed with epoxy.
2/5/19 - The temporary bulkheads are removed and the interior is sanded.
The interior is fiberglassed.
2/6/19 - The port side footbrace studs are installed.
The starboard side footbrace studs are installed.
2/7/19 - The deck is epoxied to the hull.
2/8/19 - The port side interior shear seam is filled with epoxy and covered with fiberglass tape.
Starboard side.
2/11/19 - The deck is sanded smooth.
Fiberglass cloth is laid on the deck.
2/12/19 - The overhanging cloth is trimmed and a fill coat of epoxy is applied.
2/13/19 - The hatches are traced out on the deck.
Forward hatch is cut out.
Aft hatch is cut out.
Forward bulkhead is epoxied in place.
2/15/19 - The coaming riser is epoxied in place.
The coaming lip is epoxied in place.
2/17/19 - The coaming is giving a fill coat of epoxy.
The hatch lips are epoxied in place.
2/20/19 - Epoxy endpours are installed.
2/21/19 - The deck is sanded in preparation for varnishing.
The hull is sanded.
2/26/19 - Sanding dust is washed off the hull.
The first coat of varnish is applied to the hull.
2/28/19 - Several coats of varnish have been applied.
Several coats of varnish are applied to the hatch covers.
3/1/19 - The deck is ready for varnish.
The first coat of varnish is applied to the deck.
3/3/19 - Several coats of varnish are applied to the deck.
3/8/19 - The upgraded seat is installed.